RUVUBU
BURUNDI
KEY FIGURES
MISSIONS REALISED BY DAMS AND GRIDS
-
Drone topographic survey with ground control points and terrain modelling
-
Geological assessment of the Kaburantwa river site
-
Hydrological study: 346 km2 catchment, flow-duration curve and design floods
-
Conceptual design: diversion weir, headrace canal, penstocks and powerhouse
-
Grid connection and transmission line design
CLIENT: SPV Kabu23 Hydropower
LOCATION
-
Installed capacity
-
Type of plant
-
Rated Discharge
-
Net Head
-
Production forecast
-
Current stage
16,5 MW
Run-of-river plant
11,3 m3/s
157,2 m
90,1 GWh
Feasibility completed